Year: 2018
Value of Contract: N/A
Scope of Work: Fast Brothers redeveloped the Steinbach Campground. As the general contractor our work included sewer, water and land drainage as well as installing a water meter chamber. The project also included the excavation, gravel supply and paving for the street.